This last weekend I started sizing up building the epinage section. Last fall I assembled and riveted most of the bulkheads. Stations 205 & 209 I drilled and Clecoed together until now.
The first step is to mount the vertical stabilizer spar for the rudder to bulkhead 209.
BLARG!!! The three holes I drilled last fall do not line up with the factory assembled spar! Not the factories fault. It is mine. (Old bulkhead at right.)
I missed two of the holes by about 1/6th inch. I could just drill them out to the next size, but that wouldn't be right. So, I found some .032 aluminum stock and made a new 209 bulkhead.
Here is my home made bulkhead. The bending brake came in handy. I used the factory assembled spar to "match" drill the holes in my new bulkhead.
Corrosion protected and riveted the bulkhead looks pretty good. I need to mark the CL and HRL on the bulkhead.
I corrosion protected and riveted up the 205 bulkhead and the adjoining parts.
This made for a full weekend. I will have to start making the assembly "table" for the epinage section so I can start assembling from bulkhead station114.75 to bulkhead station 209.
Still have to get my wings from the factory. They are having an open house August 18th & 19th. I may go that weekend.
More to come......
BWW
No comments:
Post a Comment